The first year in brief
A short account of the doctorate’s first year, for a reader who wants to start there.
This account runs to October 2026 and is complete at that level. The pages linked below it hold the detail and the evidence on which it rests, and may be consulted where a question arises.
The doctorate’s first year began in January 2026, when ALTERITY premiered at IFFR. February and March went into the instrument chain and the masterclass in Haarlem, and into a run of applications. Hermes Agent arrived in April 2026, and the work changed pace from there. The same month brought RETRIEVAL beside ALTERITY and the first port of HMSL to the Macintosh Plus core. On 1 May, music composed by agents in HMSL was presented in public for the first time, at Human After All? in Rotterdam. That month the loop was also built that lets an agent write KML, see the picture and try again.
June moved the agent onto a Raspberry Pi with a MIDI router of its own. July rebuilt CONDUCTOR into sixteen modules, and every claim in it was checked against raw output. August audited the system and froze its design against new features. From late August ALTERITY ran at MU in Eindhoven, driven by the agent throughout. September brought the Netherlands Film Festival and the present wording of the question. October was a month of explanation and sources, including the interview with David Rosenboom.
What the work produced that nobody set out to find is on Discoveries. These results are Gardner’s observations so far, and they are not yet traced to the session record. Agents drove the moving heads into choreographies in which two fixtures seemed to take roles. During the narration at MU the video image turned negative at moments about otherness, without anyone asking for it. Agents learned the presets of the Kurzweil K2000 until they could operate the machine much as a person would. They wrote working Pure Data patches, and they found faults in patches Gardner had written himself.
What the year showed it cannot yet do is on Expected difficulties. Verification can only be done by Gardner himself, so the pace of the research is limited by the time he has to check what the agents report. Findings are hard to repeat, because the models change, the running software drifts and the instruments age. The method also depends on things that can stop without warning, among them the agent framework and the machines. Two stops happened during the year: a corrupted memory card, and an agent that deleted a codebase. The premiere and the run at MU differ in many ways at once, so the effect of any single change between them is difficult to separate.
Two questions stay open. Training a model on KML and HMSL raises rights that have to be settled first. It is not yet known what happens to the artist’s own fluency if agents write the tools, and the practice’s present answer is to keep the system one its operator understands from end to end. The First-year review argues the case for the year, that the method has to stay open to the capability it studies. The Go-no-go assessment sets out the conditions the year had to satisfy and the gaps it leaves.
The first year did not follow the plan. The plan was written in 2025, when no agent could yet build its own tools. Hermes Agent arrived in April 2026 and took on work that had belonged to Gardner alone. It wrote and repaired code. It learned to operate the legacy machines and their software. The archive records this as the acceleration of capability, a change the plan did not foresee, and it is treated as a finding as well as a condition.
Related topics
The following pages are part of this page but are not needed to understand it. They can be opened from here for further exploration.
- The first year, the full record of the year, with every dated entry
- Activity record, the doctorate’s activity on its own
- The plan, year by year, the plan the year departed from
- First-year review and Go-no-go assessment, the review and the conditions
- CONDUCTOR development history, the system month by month
- Discoveries, Expected difficulties and Acceleration of capability
- The full account, the doctorate in four levels